Shanghai Lankong complete sets of electrical device Co.,Ltd( the Chinese people's Liberation Army Shanghai Lankong Electrical Equipment Plant ) is a large enterprise specializing in the production of high and low voltage electrical equipment and access to national machinery, power two issued by the Ministry of the high voltage switch cabinet production license and senior-type low-voltage complete sets of equipment production license ( red card ).
Our Contact Now
Get In Questions Touch
Tel
+86 21 65442001 (switchboard) / +86 18117491336 (business)
Address
No.219 Yuanxin Rd. Baoshan District, Shanghai, China
CONTACT US
Get in Touch




NEWS
In February 2024, Shanghai lankong Electrical Equipment Co.,Ltd accepted the Ji 'an Contact Station of the West-East Gas Transmission Branch of National Pipeline Network Group United Pipeline Co., LTD., to increase the electrical equipment order of compressor unit project.
2024-02-06
Lankong helps Wanhua Chemical Group 400,000 tons/year propylene oxide (POCHP) and other projects
Since May 2023, Shanghai lankong Electrical Equipment Co.,Ltd has received several orders of electrical equipment for the substation project of Wanhua Chemical Group Co., LTD. Such as citral project citral device substation, Wanhua Chemical 400,000 tons/year propylene oxide (POCHP) project, 3061 special amine device substation and so on.
2023-05-08
Lankong helps Sinopec Guangzhou Tianjin Nangang 1.2 million tons/year ethylene project
In August 2022, Shanghai lankong Electrical Equipment Co.,Ltd. accepted Sinopec Guangzhou Engineering Co., Ltd. Tianjin Nangang 1.2 million tons/year ethylene and downstream high-end new materials industrial cluster project (four sets of joint substation) electrical equipment orders.
2022-08-09
In July 2021, Shanghai lankong Electrical Equipment Co.,Ltd. received the electrical equipment order of Sinopec Engineering Construction Co., LTD. Hainan Refining and Chemical 1 million tons/year ethylene and oil refining expansion project 2.6 million tons/year continuous reforming equipment project.