Project Cases

CCCC 1st Aviation Bureau Installation Engineering Co., LTD

The loading and unloading process equipment system project of 100,000 tons grain and oil berths in Henggang Sand Operation Area, Tiansheng Port, Nantong Port

2024-04-24

Nantong Tiandian Intelligent Energy Co., LTD

Nantong Tidian Smart Energy intelligent integrated energy management system project

2024-04-24

Shanghai Baoshan base of China Baowu Group

Since 1998, the company has been providing various voltage level switchgear products to China Baowu Group Shanghai Baoshan Base for a long time. More than 360 contracts have been signed annually, and the annual output value is stable at more than 20 million.

2024-04-24

Jiangsu Huadian Tongzhouwan Energy Co. LTD

Centralized fishpond photovoltaic project 20MW

2024-04-24

Jiangsu Huadian Tongzhou Cogeneration Co., LTD

Jiangsu Huadian Tongzhou Cogeneration Co., Ltd. built a new 2*40MW triple supply project

2024-04-24

Tianwan Nuclear Power Plant, Jiangsu Nuclear Power Co., LTD

Tianwan Nuclear Power Plant BOP area 400V low-voltage switchgear renovation project

2024-04-24

< 123 >