Project Cases
CCCC 1st Aviation Bureau Installation Engineering Co., LTD
The loading and unloading process equipment system project of 100,000 tons grain and oil berths in Henggang Sand Operation Area, Tiansheng Port, Nantong Port
2024-04-24
Nantong Tiandian Intelligent Energy Co., LTD
Nantong Tidian Smart Energy intelligent integrated energy management system project
2024-04-24
Shanghai Baoshan base of China Baowu Group
Since 1998, the company has been providing various voltage level switchgear products to China Baowu Group Shanghai Baoshan Base for a long time. More than 360 contracts have been signed annually, and the annual output value is stable at more than 20 million.
2024-04-24
Jiangsu Huadian Tongzhouwan Energy Co. LTD
Centralized fishpond photovoltaic project 20MW
2024-04-24
Jiangsu Huadian Tongzhou Cogeneration Co., LTD
Jiangsu Huadian Tongzhou Cogeneration Co., Ltd. built a new 2*40MW triple supply project
2024-04-24
Tianwan Nuclear Power Plant, Jiangsu Nuclear Power Co., LTD
Tianwan Nuclear Power Plant BOP area 400V low-voltage switchgear renovation project
2024-04-24